Turn today's task list into focus sessions and breaks that fit around your meetings and peak hours, with tasks that don't fit listed separately instead of being squeezed in.
Plan focus sessions for one workday from the tasks and constraints below. Fit the work into the time I actually have. If it does not fit, say what is left over rather than shortening estimates or skipping breaks. ## Inputs Date and working hours: [WORK_HOURS] Fixed commitments (meetings, lunch, pickups) with times: [FIXED_EVENTS] Tasks with estimated minutes and priority (High/Medium/Low), plus any deadline today: [TASKS] Preferred session length range and break length (for example sessions of 25-90 minutes with 15-minute breaks): [SESSION_RULES] My most productive hours: [PEAK_HOURS] Known distractions or interruptions: [DISTRACTIONS] ## Instructions 1. Block the fixed commitments first, then compute the free time that remains. 2. Place High-priority and deadline tasks in the peak hours first, then Medium, then Low. 3. Split a task longer than the maximum session into parts, and label them (part 1/2, part 2/2). Do not merge unrelated tasks into one session unless they are small and similar. 4. Put a break after each session, following my break rule. 5. If the total estimate exceeds the free time, move the lowest-priority work to an Overflow list and say how many minutes are missing. 6. Add one or two distraction safeguards for the specific distractions I listed. 7. If I want a calendar import, also return the sessions as CSV with the headers Subject, Start Date, Start Time, End Date, End Time. ## Return - Schedule table: start, end, session or break, task, priority - Totals: free minutes, scheduled focus minutes, overflow minutes - Overflow list with suggested new days - Distraction safeguards - Optional calendar CSV ## Acceptance checks - No session overlaps a fixed event or another session, and all times are inside working hours. - Each task's scheduled minutes equal its estimate, or the remainder appears in Overflow. - No session is longer than the stated maximum. - High-priority tasks start within the peak hours when there is room.
Illustrative input and expected result. This example is a verification guide, not a recorded model run.
Content reviewed .
Hours: 09:00-17:00. Fixed: lunch 12:30-13:00, team meeting 13:00-14:00. Sessions 25-90 min, 15-minute break after each. Peak: 09:00-12:00. Tasks: Analyze survey 120 High; Draft proposal 90 High; Review PR backlog 60 Medium; Plan sprint 60 Medium; Expense report 30 Low. Distractions: Slack pings.
Illustrative; not a recorded model run. Analyze survey is split into 90 + 30 minutes. 09:00-10:30 Analyze survey (1/2); break; 10:45-12:15 Draft proposal; 12:30-13:00 lunch and 13:00-14:00 meeting (both fixed); 14:00-14:30 Analyze survey (2/2); break; 14:45-15:45 Review PR backlog; break; 16:00-17:00 Plan sprint. Focus total 330 minutes. Expense report (30 min, Low) goes to Overflow with a suggested slot tomorrow. Safeguards: Slack set to Do Not Disturb during sessions, with replies batched in breaks.
Ask questions or share concrete improvements.
No comments yet.
Sign in to join the discussion.
Guides for adapting and checking prompts: