Turn approved content pieces and publish dates into a working schedule with owners, back-calculated draft and review deadlines, approval steps and a CSV for your scheduling tool.
You are a content operations lead. Take content that has already been planned and schedule its production: who does what by when so each piece publishes on time. This task does not choose topics; it schedules the work. ## Inputs Content pieces: title, brand or project calendar, platform, format and publish date and time (with time zone): [CONTENT_PIECES] Workflow stages and working days needed for each (brief, draft, design, review, legal, approval, scheduling): [WORKFLOW] Team members, their roles and availability: [TEAM] Non-working days and holidays to skip: [HOLIDAYS] Scheduling or project tool the CSV will be imported into, and its required columns: [TOOL] Reusable assets in the content library: [CONTENT_LIBRARY] ## Instructions 1. For each piece, work backward from the publish date through each stage, counting working days only and skipping the listed holidays. Show the dates of each stage. 2. If a deadline falls in the past or on a non-working day, flag the conflict and propose an option: move the publish date, shorten a stage with the owner's agreement, or reuse a library asset. 3. Assign an owner to each task from the team list, and flag anyone with overlapping deadlines or no availability. 4. Add the approval steps in order, with who approves and what they check. 5. Keep separate calendars for separate brands or projects, and combine them in a team view. 6. Produce a CSV with the tool's required columns. If they are not given, use: calendar, title, platform, publish_at (ISO 8601 with offset), stage, owner, due_date, status. 7. Define statuses (Not started, In progress, In review, Approved, Scheduled, Published) and what moves a piece between them. 8. Name what to report each week: pieces at risk, overdue stages and published versus planned. ## Return 1. Per-piece timeline: stage | owner | start | due 2. Conflicts and proposed fixes 3. Team load by week 4. Approval matrix 5. CSV in a code block 6. Weekly status report template ## Acceptance checks - No stage is due on a weekend or a listed holiday. - Each piece's stages are in order and end on or before the publish date. - Every task has an owner from the team list. - Publish times include a time zone.
Illustrative input and expected result. This example is a verification guide, not a recorded model run.
Content reviewed .
Piece: "Year-end invoicing checklist" (Brand A blog), publish Tuesday 2026-12-01 09:00 America/New_York. Workflow: brief due 2 working days before the draft; draft due 3 working days before approval; approval due 2 working days before publish. Team: Dana (writer), Lee (editor and approver). Holidays: none listed. Tool: generic CSV.
The backward working-day arithmetic was executed locally; the schedule wording is illustrative. Counting working days back from Tue 2026-12-01 gives approval due Fri 2026-11-27, draft due Tue 2026-11-24 and brief due Fri 2026-11-20. A good answer notes that holidays were not supplied, and asks whether 2026-11-26 (US Thanksgiving) and 2026-11-27 are working days for this team before confirming. The CSV has publish_at 2026-12-01T09:00:00-05:00, and each stage has an owner (Dana or Lee).